Non Destructive Test - Ultrasonic Pulse Velocity Test
Ultrasonic Pulse Velocity Tests
Application:
These tests are primarily done to establish:
• The homogeneity of concrete
• Ppresence of cracks, voids and other imperfections
• Changes in quality of concrete over time
• This test does not establish compression strength
of tested concrete
UPV Tests are done in accordance with Indian standards
IS: 13311 (Part 1)
Procedure:
• The concrete surface where probes are to be applied is cleaned properly.
• Grease is applied on the test surfaces
• The probes are pressed on the surface of the structural element to remove air gaps.
• Distance between the two probes is noted.
• Read time taken for the ultrasonic pulse from the instrument.
• Calculate Velocity = distance / time
Pulse velocity by cross probing Concrete Quality Grading
1 Above 4.5 km/s Excellent
2 3.5 km/s to 4.5 km/s Good
3 3.0 km/s to 3.5 km/s Medium
4 Below 3.0 km/s Doubtful
Tuesday, July 10, 2018
Project Management Services
Project Management Services
u The three prime objective of PMS are:
v
To meet specific
performance within estimated & approved cost
& on Schedule
v
To achieve desired outcome; smooth
co-ordination of all interdependent agencies is required
v
The PMS must take Complete Ownership of the
project and must add potential benefit to the Organization
v
Make best use of available resources and
deliver the best
v
Use latest Construction technique &
Equipment to minimize the cost and maximize higher ROI (Return on Investment)
v
Use Subject Matter
Experts available in market during planning stage
u The methodology & processes followed are
v
Project Management Practices of Project
Management Institute (PMI)
v
Infrastructure Service Delivery Management
And other
guiding methodologies are:
1. TQM (Total
Quality Management) for optimum utilization of resources and minimal wastage
2. Six Sigma
Business Improvement methodology during execution phase to improve Quality
Subscribe to: